Bypass tunnel Sochi, Russia - For construction of the emergency parking bays, the formwork carriage was designed with a width of 14.30 m. Moving the carriage to the next bay through the smaller-sized standard cross-section, required a reduction in the maximum external dimensions.

Des solutions intégrées pour soutenir les projets d'infrastructure

Relevez tous les défis avec les produits PERI pour l'infrastructure, conçus pour construire des structures qui durent.

Infrastructure

Produits d'infrastructure PERI

The lightweight stair tower for flexible access solutions
The suspended scaffold can be manoeuvred with little effort due to smooth plastic rollers.
PERI UP Flex Shoring: The maximum level of flexibility.
With PERI SCS, the loads from the fresh concrete pressure are transferred without formwork ties through the brackets into the climbing anchors of the previous concreting section.

##prodhomepagecta##

Contactez-nous - nous nous ferons un plaisir de vous aider.