Hotel Marques de Riscal, Elciego, Spain - The PERI UP Rosett modular scaffold allowed optimal adjustment to the complicated building geometry.

Aperçu du projet

Avec nos clients, nous réalisons de grandes choses. Qu'il s'agisse d'échafaudages, de gratte-ciel, de ponts ou de tunnels, nous vous montrerons les projets que nous avons réalisés avec nos clients.

Tous les projets

Viaduct Krakow-Płaszow Railway Junction - Customized solution through the flexible and modular adaptability of the system.
Oparno Motorway Bridge, Czech Republic - The 258 m long and 50 m high arched bridge crosses the Opamo Valley in the Bohemian Forest.
Motorway bridge over the Rio Sordo, Vila Real, Portugal - Up to 30 m high VARIOKIT VST heavy-duty shoring towers served as falsework for the construction of the bridge edge sections. Each leg carried a load of around 600 kN.
Trmice Motorway Bridge, Aussig, Czech Republic - For the 1,083 m long Trmice motorway bridge near Aussig in the Czech Republic, 59 piers were cost-effectively formed using PERI formwork.
Citytunnel Malmö, Sweden - The southern entrance area was constructed using the cut-and-cover method for a length of around 1.5 km.
BBI Airport, Berlin Brandenburg, Germany - Only when seen from an aerial perspective is the scale of the construction site really apparent: the area is the size of around 2,000 football pitches.
Lanaye Lock Bridge, Belgium - In the complex area with an extremely tight outer radius, the concentrated loads of the radially-arranged cantilever brackets are transferred into the available bridge piers by means of pressure supports.
Sheikh Khalifa Bridge, Abu Dhabi, United Arab Emirates - The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.
Midfield Terminal Building, Abu Dhabi - The Midfield Terminal Complex is the ultimate in construction sites.
Tunnel Jumeirah Palm Island, Dubai, United Arab Emirates - In 25 m long concreting steps and four cycle sequences, the tunnel bottom plate, two wall sections respectively and then the slab could be concreted one after the other.
rabat-iteen-interchange-infrastructure-peri-formwork-shoring
Traffic junction Czerniakowska, Warsaw, Poland - The pre-stressed hollow box superstructure was formed with VARIO GT 24 wall formwork and MULTIFLEX slab formwork.
The Squaire, Frankfurt am Main, Germany - PERI UP scaffolding on the longitudinal sides of the building was designed according to the expected loads and carried the construction loads.
Munich Airport Satellite Terminal, Germany - The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield and encloses the apron tower and incorporates the existing baggage sorting centre. Construction is taking place during normal airport operations and presents an enormous challenge to all those involved in the project.
Øresund Link, Denmark–Sweden - One of the two production lines with the formwork assemblies reaching a total weight of 1,150 t. Here the internal formwork has been retracted into the reinforcement cage.
Puente Baluarte, Mexico - Apart from the two pylons, a total of nine double piers are being constructed on both sides of the ravine which are braced by means of massive cross beams.
Viaduc de Millau, France - In the area of the double piers, 14 complete ACS self-climbing units with telescopic working platforms were used.
Deer crossing bridge Zehun, Czech Republic - PERI UP Rosett formed the falsework construction and was erected according to the type test. The tight construction schedule required support along the entire length of 75 m.
Motorway bridge over the Drava, Osijek, Croatia - A VARIOKIT cantilevered parapet carriage serves for constructing the external cantilevered parapets.
Infrastructure buildings, Pilbara region, Australia
Bridge over the Dunajec, Tarnow, Poland - With some supplementary system components, the VARIOKIT engineering construction kit can also be used for the balanced cantilever construction method.
Cristo Rei Monument, Lisbon, Portugal - Work could be safely carried out on the spacious and geometrically adapted working platforms of the PERI UP Rosett scaffold which was erected up to the head of the statue.
Forum roof Munich Airport, Germany - Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.
Karlskirche Church Vienna, Austria - The cantilevered working platform as seen from the visitors platform.
Maritime museum Tallinn, Estonia - A total of 8,500 m² of exhibition space is now available under the three domes.
Museum of military history, Dresden, Germany - The almost 100 m long Libeskind-designed structure features a 30-metre high wedge tip made of glass and steel.
LGS Weather Protection Roof from PERI, the lattice girder system for weather protection, rain protection, snow protection, hail protection.
Unusual Scaffolding solution: Cantilevered instead of positioning. New engineered working scaffold solution.
Bridge renovation Ponte Rio Tua, Vila Real, Portugal - For the renovation of an arched bridge built in 1940, a scaffold construction on the basis of PERI UP modular scaffolding was erected.
Hradec Králové Library, Czech Republic - With an X-shaped floor plan, the architectural concept of this building created a new highlight in the urban development of the city of Hradec Králové. Originally, all external surfaces should have received an orange-painted facade. This concept was completely rejected due to the high-quality concrete surface finish.
Casa da Música, Porto, Portugal - Built to coincide with “Porto 2001 – European Culture Capital”, the concert hall is pictured here after structural work had been completed.
Centre Pompidou, Metz, France - The tent-like roof construction reached a height of 77 m. For the up to 32 m high PERI UP Rosett shoring towers, adapting to the complex roof geometry was carried out using system components from the VARIOKIT engineering construction kit.
Edificio Ágora, Valencia, Spain - A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
MAXXI - Museo nazionale delle arti del XXI secolo, Rome, Italy - This extraordinary structure is characterized by twisting reinforced concrete walls which reach heights of up to 14 m.
Mausoleum Michniów - The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.
Mercedes-Benz Museum, Stuttgart, Germany - The execution of this very impressive project required unique engineering and assembly implementation on the construction site.
Museum of Tomorrow, Rio de Janeiro - For realising the extraordinary museum on time and within budget, PERI planned, produced and delivered over 3,500 customised special formwork elements.
National stadium Kazimierz Górski, Warsaw, Poland - The complex construction project with highest quality requirements demanded an experienced construction site team as well as on-site support through PERI engineers.
Parco della Musica e della Cultura, Florence, Italy - The complex includes a 1,800-seat opera house, a concert hall for 1,100 music lovers as well as a theatre for audiences up to 2,000.
Pegasus Sculpture, USA - The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
Restaurante Florante Submarino, Valencia, Spain - With 77 t of PERI UP Rosett materials, the building´s design could be accurately realized as a three-dimensional spatial load-bearing structure.
Sports arena Lora, Split, Croatia - The PERI solution served as both shoring and an assembly platform on which the enormous steel trusses of the roof construction were set down, assembled and moved into position.
St. Martins Therme & Lodge, Frauenkirchen, Austria - With formwork and scaffolding systems perfectly matched each structural component, the concrete frame could be completely finished in only 9 months.
Temple of Divine Providence, Warsaw, Poland - With the help of the PERI UP Rosett modular scaffold system, 24-metre high shoring was erected at the main entrance of the temple. Even at large heights, up to 40 kN per leg could be safely and reliably transferred.
UTEC University Campus, Lima, Peru - With the help of the customized PERI formwork and scaffolding solution, a new campus complex is being realized in Lima – with high architectural requirements and a tight construction schedule.
Overview of the construction site - PERI Project - "Humboldt Forum" City Palace, Berlin
ADAC Headquarters, Munich, Germany - For the construction of the new ADAC headquarters, PERI supported the Züblin construction team with efficient formwork and scaffolding solutions as well as competent service.
Banco de la Ciudad de Buenos Aires - A standardized construction kit system as well as the planning and delivery of formwork and scaffolding from a single source makes the PERI project solution very cost-effective.
Federal Chancellery Berlin - The challenging building form called for flexibly adaptable formwork and scaffolding systems.
DaimlerChrysler Subsidiary Warsaw, Poland - Not far from Warsaw‘s city centre, the new headquarters building of the automotive group together with a Mercedes-Benz dealership containing showrooms and a service centre has been realized.
Der neue Zollhof, Düsseldorf, Germany - The three spectacular buildings of the new Zollhof complex in Dusseldorf during different stages of construction.
Hotel Capella, Sentosa Island, Singapore - The new 6-star hotel complex was constructed around two buildings dating from the colonial times. With SKYDECK, the construction of the reinforced concrete slabs could be carried out efficiently and safely.
North Station Vienna - The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
Galileo Satellite Control Centre, Oberpfaffenhofen, Germany - The outside of the building resembles a medieval fortress. The facade is comprised of window openings as well as pre-determined regular tie points and horizontal pilaster strips.
Potsdamer Platz, Berlin, Germany - The Potsdamer Platz is a city of the future with office and residential buildings, schools, theatres, hotels and shopping centres in the heart of Berlin.
alrimal site Riyadh .
PERI UP shoring system used at various heights supporting the slab formwork
Albian Sands, Fort McMurray, Canada - Through the planning and supply of formwork and scaffolding from one source, the MULTIFLEX slab formwork and PERI UP shoring could be perfectly matched.
Grain Silo near Parma, Italy - Cost-effective PERI climbing concept: with a complete platform level and halved on-site wall formwork requirements, fast and continuous working operations were achieved.
Power plant Belchatow, Poland - The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.
Eemshaven Power Plant, Netherlands - For the power plant construction in Eemshaven, the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability.
LNG liquid gas reservoirs, Cameron, USA - In the US state of Louisiana, three enormous liquid gas tanks were simultaneously realized using PERI know-how. Each of the structures has an 80 m diameter and a wall height of 44 m.
Exhibition centre Bilbao, Spain - For the construction of the Bilbao Exhibition Centre, PERI engineers developed a practical movable falsework and formwork solution.
Stanari Thermal Power Station, Doboj, Bosnia-Herzegovina - A total of 9 circular piers with 3.60 m diameters and 40 cm wall thicknesses will subsequently carry a steel platform for the condenser.
Cement plant Ivano-Frankowsk, Ukraine - For extending the cement plant, engineers from PERI Ukraine designed a comprehensive and sophisticated formwork and scaffolding solution.
sohar-project-peri-pd8
Los Ramones II Pipeline, San Luis Potosi, Mexico
Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.
21st Century Tower, Dubai, United Arab Emirates - The RCS climbing protection panel complete encloses the upper floors under construction and provides protection against wind and weather - and increases productivity.
Absolute World, Missisauga, Canada - One climbing system – two climbing methods: with protection provided by the RCS climbing protection panel, the two twisting Absolute World towers rose steadily upwards in regular weekly cycles.
Al Hamra Tower, Kuwait City, Kuwait - Already during the construction phase, the Al Hamra Tower stood out through its timeless elegance which was achieved by turning the external facade by 130 degrees.
Avala TV Tower, Belgrade, Serbia - The perfectly adapted shoring and working scaffold optimally supplemented the cost-effective formwork solution.
Cuatro Torres Business Area, Madrid, Spain - For the very wide range of requirements, PERI provided the most cost-effective solution with the ACS self-climbing formwork.
Evolution Tower, Moscow, Russia - Inclined and crane-independently climbed RCS protection panel units provide here a very high level of safety.
Hotel Mélia, La Défense, Paris, France - For the construction of the Hotel Meliá in the "La Défense" office district, PERI developed a comprehensive climbing formwork solution. This serves not only as an enclosure, which ensures the safety of the construction teams at all times, but also it supports the precast parapets during erection.
Il Bosco Verticale, Milan, Italy - Massive, 28 cm thick reinforced concrete balconies cantilever outwards for 3.35 m in an irregular fashion on all four sides of the building.
ISET Tower, Yekaterinburg, Russia - The ISET Tower in Yekaterinburg is characterized by its external shape. PERI planned a comprehensive, crane-independent concept of the climbing formwork required on the elevator shafts and core walls, as well as the climbing protection panel on the building´s outer edges.
JKG Tower, Jalan Raja Laut, Kuala Lumpur - A complete solution consisting of formwork, scaffolding and related services has guaranteed safety at all heights and rapid progress during the construction of JKG Tower complex.
Marina Bay Sands, Singapore - The American Las Vegas Sands Corporation is the owner of the complex the highly visible hotel towers.
Porta Nuova Garibaldi, Milan, Italy - Each of the two towers has three reinforced concrete cores which were constructed with help of two PERI ACS self-climbing variants.
Prosta Tower, Warsaw, Poland - The PERI UP scaffolding extended upwards on the outside keeping pace with the construction progress.
RONDO 1, Warsaw, Poland - The PERI CPP climbing protection panel reliably encloses the upper floors under construction.
Torre Agbar, Barcelona, Spain - The cylindrical core and facade walls of this 142 m high office building were constructed with PERI ACS self-climbing technology.
Trump International Hotel & Tower, Chicago, USA - With a height of 415 m, the Trump International Hotel and Tower on the Chicago River is a very impressive skyscraper.
Warsaw Spire - With a height of 220 m, the new office tower of the "Warsaw Spire" building ensemble will be the tallest office building in Warsaw after completion. Two office buildings flank the tower, each 55 m high.
habtoor-residence
Smithland Hydroelectric Power Plant - The Smithland hydroelectric power plant is equipped with 3 turbines; due to the extremely tight construction schedule, all three tubes with their constantly changing cross-sections are being realized at the same time.
Sewage plant As Samra, Jordan - With the selected PERI formwork and scaffolding systems, the construction team was able to cost-effectively fulfil all requirements in spite of the tight construction schedule. The solutions developed by PERI engineers and the local site management, along with support provided by PERI specialists, contributed to efficient and problem-free construction.
Nile river barrage Naga Hammadi, Egypt - The variable VARIO girder wall formwork, together with SKS climbing scaffold, formed large area transportable units.
Lock facilities, Panama Canal, Panama - More than 12 months after starting the development work on the Panama Canal, the dimensions and the massive structural elements are clearly visible.
Gravity dam Barrage Koudiat Acerdoune, Algeria - The 57° inclined run-off channel bottom plate and intermediate walls were constructed with concreting cycle heights of 2.40 m.
Zahid Business Park
PERI project - water retaining structures - Foz Tua Dam, Vila Real – Alijó, Portugal
Motorway bridge over the Rio Sordo, Vila Real, Portugal - The 2.00 m wide shoring scaffold sections are connected longitudinally by means of heavy-duty spindles and push-pull props to form shoring towers.

Vous souhaitez savoir comment PERI peut soutenir votre prochain project?

Consultez nous et façonnant l’avenir ensemble.

Contactez-nous !